※ The capacity of the electric furnace is based on the density of steel 7.8 (the density of aluminum is 2.7, so the aluminum of equal weight: the matching power is the same, and the capacity needs x 3 times the furnace body)
※ The melting time and tons of power consumption have important relationship with the equipment matching power, raw material shape, raw material density, worker proficiency,
※ In the form above,the "ton power consumption (kwh/T)" is a new series of power consumption, which will consume 15% or more of the power supply in Common parallel IF power supply
※ Equipment configuration: medium frequency power supply, capacitor cabinet, furnace body (steel shell or aluminum shell), hydraulic station (or reducer) tilting system, water cooling cable etc;
※ The Above is the standard product data, can design different power according to the user demand, non-standard product with different melting speed .