Vacuum melting furnace using what problems should be paid attention to

by:Hengyang Furnace     2020-04-13
Vacuum melting furnace furnace on the center of the department set up a stainless steel melting pool by sealing device and discharging guide fixed connection, discharging guide groove at the other end fixed in the furnace of the furnace wall, Melting pool at the top of the furnace cover center set up on the discharge screw, through melting pool into to discharge guide groove, discharging screw on the furnace cover side set the chimney of exports and melting pool connected; A new high-efficiency gas burner, gas for heating the raw material, high calorific value, melting speed, and the ability to move production, filled the gap of borax smelting equipment; With low energy consumption, high heat utilization rate, small volume, reasonable structure, convenient maintenance and low cost. Vacuum melting furnace using problems which should be paid attention to: 1. Alloying in advance to the liquid steel to join one or several of alloying elements, to the finished product specifications of the operation process is referred to as alloying steel components. In most cases deoxidizing and alloying was conducted at the same time, to join part of deoxidizer in steel consumption of steel deoxidized, discharge into products; The other one is absorbed by the molten steel, alloying effect. Before the deoxidization action not complete, and deoxidizer adding alloy to be absorbed by the molten steel at the same time the effect of alloying called alloying. 2. Control to ensure the final steel composition all meet the requirements of the standard operation. Composition control throughout from ingredients to produce steel of each link, but the focus is on alloying of alloy element composition of the control. For high quality steel often requires precise control of the composition in a narrow range; Generally without affect the performance of steel, according to the medium and lower limit control. 3. Melting period steel melting period mainly for open hearth and electric furnace steelmaking. Vacuum melting furnace steelmaking from molten iron to burden all over against the said melting period. Melting period's mission is to burden for melting and heat up as soon as possible and make good slag melting period. 4. Reduction period average power vacuum melting furnace steelmaking operation, usually the end of the oxidation gathers up to the completion of the steel slag this paragraph of time is called the reduction period. Diffusion, its main task is to build reductive slag deoxidation, desulphurization, control of chemical composition and temperature adjustment.
Foshan Hengyang Furnace Manufacturing Co.,Ltd is different from other companies as we provide timely and unique services to our respected clients.
Foshan Hengyang Furnace Manufacturing Co.,Ltd is a steel melting furnace services company that creates steel shell furnace metal melting furnace for coreless type induction furnace.Our services have brought great value to customers. Welcome to visit us at Hengyang Furnace.
We persevere in keeping the customers pleasant and supporting them with aluminum smelting furnace at a reasonable price.
continous casting machine is produced by Foshan Hengyang Furnace Manufacturing Co.,Ltd’s professional skills in high technology.
The key to rolling mill machine is understanding where there is a problem or need in certain markets and knowing how to solve it.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...